Chapter 02 · Technical Standards

Basic Housing Unit (BHU) Minimum Living Standards:
6 Technical Requirements

Published 2026.04.29 · Last updated 2026.07.13

This article summarises the specific certification standards from a landlord's perspective. Each standard includes a "common non-compliance scenario" to help landlords anticipate what works their unit may require.

Summary: BHU certification requires meeting 6 technical standards — floor area, ceiling height, ventilation, self-contained toilet, independent utility metering, and fire protection — with toilet-related renovation costing up to HKD 100,000 per unit when built from scratch.
01

Minimum Internal Floor Area of 8 sq m

8 sq m minimum · including toilet · measured at internal walls

The "internal floor area" (including toilet) of each subdivided unit must not be less than 8 sq m.

Common non-compliance scenario: Subdivided flats in older buildings constructed before the 1980s often contain units of 6.5–7.5 sq m — "subdivisions within subdivisions" (Owl Square case data, 2018–2026). These typically require units to be merged.
Renovation fix and cost: This is the one requirement of the six that cannot be resolved through renovation alone — the shortfall comes from how the flat was subdivided in the first place. The only realistic route is to knock through and re-partition, merging two undersized units into one that meets the 8 sq m threshold. In practical terms, that means the landlord accepts the loss of one rentable unit rather than paying a renovation bill. If a property has several units in the 6.5–7.5 sq m range, it is worth measuring them yourself before commissioning an Authorized Person assessment, so the assessment fee is not spent on units that renovation cannot fix.
02

Minimum Clear Ceiling Height of 2.3 m

2.3 m minimum · 2.0 m below any beam

The lowest point of the ceiling in a subdivided unit must not be below 2.3 m; where a beam is present, the clear height below the beam must not be below 2.0 m.

Common non-compliance scenario: Rooftop structures, converted loft spaces, and added mezzanine floors frequently fail this requirement.
Renovation fix and cost: Like floor area, ceiling height is largely fixed by the building's structure and cannot generally be "renovated" away. The only scenario where works can help is when a false ceiling, thick screed layer, or raised mezzanine floor is eating into the clear height — removing it may bring the unit into compliance, at a cost of roughly HKD 5,000–15,000 per unit depending on scope (2026 market rate). But where the shortfall comes from an unauthorised rooftop structure or the building's own structural slab spacing, there is usually no economically viable fix. Landlords should measure ceiling height themselves before paying for an assessment on a unit that cannot realistically be brought into compliance.
03

Lighting and Ventilation (Option A or B)

Option A: natural ventilation (opening ≥ 1/10 of floor area) · Option B: mechanical ventilation (5 ACH + 0.1 sq m window)

Each subdivided unit (and its toilet) must meet lighting and ventilation requirements under either of two options:
Option A (natural ventilation): complies with sections 30, 31, 32 and 33 (for rooms) or section 36 (for the toilet) of the Building (Planning) Regulations.
Option B (mechanical ventilation): rooms must have at least one openable window with a glazed area of at least 0.1 sq m, artificial lighting, and mechanical ventilation achieving at least 5 air changes per hour (5 ACH); the toilet must have artificial lighting and mechanical ventilation achieving at least 5 ACH (no window is mandated).

Common non-compliance scenario: Units with insufficient window area (below 1/10 of floor area) that also lack a compliant mechanical ventilation system fail both Option A and Option B — one of the most common reasons applications are rejected.
Renovation fix and cost: Of the six requirements, this is the most common — and most straightforwardly fixable through renovation. The fix is installing an Option B mechanical ventilation system (exhaust fan, ducting, and electrical controls) achieving 5 ACH in both the living area and the toilet. Market cost is approximately HKD 5,000–12,000 per unit (2026 market rate), varying with ducting complexity and whether shared exhaust risers need modification. See the full renovation cost breakdown.
04

Self-Contained Toilet

Enclosed and waterproofed · flush toilet + washbasin + bathtub or shower · water point and sink outside

Each subdivided unit must have an enclosed, waterproofed toilet for the exclusive use of its occupant — shared toilets are not permitted. The Ordinance explicitly requires all three of the following fixtures inside the toilet: a flush toilet, a washbasin, and a bathtub or shower (all three are mandatory; none may be omitted). In addition, a water point and sink must be provided outside the toilet, with the surrounding area waterproofed.

Common non-compliance scenario: Shared toilets were common practice in pre-2010 older-style subdivided flats and must now be retrofitted as individual, self-contained facilities. Another frequent gap is a toilet with only a flush toilet and washbasin but no bathtub or shower — the Ordinance requires all three fixtures, so an otherwise "separate" toilet still fails without one.
Renovation fix and cost: If a unit already has a self-contained toilet but lacks a shower or adequate waterproofing, the fix is usually a targeted shower installation and waterproofing job, at relatively contained cost. If the unit has no self-contained toilet at all, one must be built from scratch — partitioning, waterproofing, drainage, and plumbing/electrical connections — costing approximately HKD 25,000–60,000 per unit. Combined with the other required works (fire door, ventilation, utility metering) typically done at the same time, the full renovation package for units needing a new toilet often reaches HKD 60,000–100,000 per unit (2026 market rate). Of the six requirements, this has by far the largest cost impact and should be the first thing confirmed at the assessment stage. See the full renovation cost breakdown.
05

Independent Water and Electricity Metering

Separate water meter (Water Supplies Department) · separate electricity meter (CLP/HK Electric)

Each subdivided unit must have a water meter provided specifically for that unit by the Water Supplies Department, and an electricity meter provided specifically for that unit by CLP or HK Electric, enabling separate measurement of consumption. (Gas sub-metering is not mandated by the Ordinance; landlords with gas-supplied units should confirm requirements separately with their gas utility company.)

Common non-compliance scenario: The practice of sharing a single water and electricity meter across an entire floor and apportioning costs by ratio no longer complies with the Ordinance. Separate meters must be applied for through the Water Supplies Department and CLP/HK Electric.
Renovation fix and cost: Apply to the Water Supplies Department and CLP/HK Electric for sub-meters, then have an electrician complete the sub-circuit wiring. Electricity sub-metering costs approximately HKD 3,000–6,000 per unit; independent water meter installation costs approximately HKD 2,000–5,000 per unit (2026 market rate), depending on existing pipe locations. If the building's total electricity meter capacity cannot support sub-metering across multiple units, an additional capacity upgrade may be required at extra cost — landlords should check with CLP/HK Electric in advance. See the full renovation cost breakdown.
06

Fire Compartmentation and Smoke Protection

FD30 fire door · FRR-60 partition walls · smoke detector · fire extinguisher · FS251 application

A subdivided unit's design, construction, and partitioning must, in the event of a fire: prevent fire from spreading within and outside the flat; have sufficient fire and smoke resistance; provide sufficient escape routes; and maintain structural stability. In practice, this means the door between each subdivided unit and the common corridor must meet FD30 (30-minute fire resistance), partition walls between units must meet FRR-60 (60-minute fire resistance), each unit and the common parts of the principal flat must each have sufficient independent smoke detectors, and the common parts must also have sufficient fire extinguishers — both inspected at least once every 12 months.

Common non-compliance scenario: Timber doors, glass doors, and lightweight steel panel doors are generally non-compliant and must be replaced with approved FD30 fire-resisting doors, with a Fire Services Department FS251 application submitted. Timber-board or aluminium partition walls also frequently fail to reach FRR-60 and are another common cause of rejection.
Renovation fix and cost: Replacing a door with an FD30 steel fire door (including installation, frame, and self-closing device) costs approximately HKD 3,000–5,500 each; doors adjacent to cooking areas may need the higher-rated FD60, at approximately HKD 5,000–8,000 each (2026 market rate). If partition walls fall short of FRR-60, they must be demolished and rebuilt or fitted with fire-rated lining boards, with cost depending on scope. Smoke detectors and fire extinguishers are comparatively low-cost items. See the full renovation cost breakdown.

Next reading: Floor Area and Ceiling Height: How They're Measured — how the 8 sq m threshold is measured and whether the toilet counts.  |  BHU Compliance Renovation Cost Estimates — detailed cost ranges and case estimates for each renovation item.  |  Key Timeline — understand the critical dates for registration, certification, and enforcement.

Further Reading
Technical Standard

BHU Ventilation Requirements: Window vs Mechanical Systems Explained

BHU ventilation requirements explained: mechanical ventilation specs, air change rates, and what landlords need to know about the most commonly failed certification step.

Technical Standard

BHU Fire Safety Requirements: Fire Doors, Partition Walls & Escape Routes

Cap. 658 Schedule 1 s.3 sets out four fire safety requirements. FD30 fire doors, mandatory annual detector checks, fire extinguishers and escape route standards explained.

Technical Standard

BHU Minimum Floor Area & Ceiling Height: Exact Calculation Method with Examples

Internal floor area must be at least 8 sq m (bathroom included) and ceiling height at least 2.3m (measured at lowest point). Includes calculation methods and solutions for non-compliant units.